7 items found
Expand all
LIBRARY

Erosion of the sea front walk at Budleigh Salterton. 19.1.70 (1970)

Gabions placed on the beach at Budleigh Salterton. 2.2.70 (1970)

Sea defence work in progress at the eastern end of the beach at Budleigh Salterton. 5.2.81 (1981)

Sea defence work in progress at the eastern end of the beach at Budleigh Salterton. 5.2.81 (1981)

Opening of the Dawlish Warren sea defences. 17.3.93 (1993)

Concrete smashed by the sea at Dawlish Warren. 19.1.70 (1970)

Concrete smashed by the sea at Dawlish Warren. 19.1.70 (1970)